PBG Issuance Service

PT JOGOSAWA PRIMA CONSULTANT

What Is PBG?

Formerly known as IMB (Building Permit), Building Approval (PBG) is a formal permit granted to building owners for constructing new buildings, modifying, expanding, or changing the function of a building in accordance with applicable technical standards. This is regulated under Government Regulation No. 16, Article 1 Point 17 of 2021.

Without Building Approval (PBG), building owners are at significant risk of facing future issues, including administrative sanctions such as written warnings, fines, restrictions on construction activities, limitations on building use, and even demolition. Therefore, PBG is crucial—not only for legal compliance but also to ensure that the building is used according to its intended purpose.

konsultan-pbg-jogosawa

Why Is Building Permit (PBG) So Important?

Building Permit (PBG) is essential for building owners who are planning to carry out construction, as it ensures legal compliance, safety, and the proper function of the building.

Moreover, Building Permit PBG is crucial when the building is to be used for financing purposes—whether through domestic or foreign investment.

With an approved PBG, the construction process and the eventual use of the building are officially recognized and legally protected under Indonesian law.

Your Trusted PBG Consultant in Indonesia

Start with a Consultation, Proceed with Confidence

Focus of Activities

We ensure your building plans comply with applicable standards and regulations to prevent potential failures during the construction process.

Objective

Ensure that the planned building complies with applicable standards and regulations.

Function

Declare that the construction of the building is legally recognized and its implementation meets all applicable standards and regulations.

Scope

Implementation of Construction & Utilization

Basic Requirements for Building Permit (PBG)

Fundamentally, there are two essential documents that must be prepared by the building owner. Once the requirements are complete, the application can be submitted directly through the SIMBG ( Sistem Informasi Manajemen Bangunan Gedung) which is managed by the PUPR

Administrative Documents:

  • Application Letter 
  • Company Legal Documents
  • Land Ownership Documents 
  • Dokumen Legalitas Badan/Perseorangan Lainnya
  • Dokumen Izin Lainnya (Wajib ada) 

Technical Drawing Documents:

  • Architectural Technical Drawings 
  • Structural Technical Drawings 
  • Mechanical, Electrical, and Plumbing (MEP) Technical Drawings 
  • Environmental Technical Documents 
  • Other Relevant Technical Data

The validity period of the Building Permit (PBG) is lifelong, unless there is an expansion/reduction in building size or a change in the building’s function.

Workflow PBG Issuance

alur-permohonan-pbg

Professional & Competent

We execute every project with a high level of professionalism, supported by a team of experts in their respective fields.

Commitment to Quality & Client Satisfaction

Every project is our priority. We are committed to delivering the highest quality—from design to execution—ensuring complete client satisfaction.

Compliant with Applicable Standards

When applying for a Certificate of Feasibility (SLF), the most fundamental aspect is understanding the applicable rules and regulations. Therefore, our team ensures that all standards and regulatory updates are consistently followed and kept up to date.

Why Choose Us?

Contact With Us

Our Client

FAQ

The cost of obtaining a Building Permit (PBG) will be determined once our technical assessment team has reviewed key information, including: Project location, Type of business or, building use, Building size, Completeness of administrative and technical documents, Once these details are provided, we will be able to give you an accurate cost estimate.

In general, the exact processing time for a Building Permit (PBG) cannot be determined upfront, as it depends on the completeness of administrative and technical documents, as well as the scheduling of hearings by the relevant authorities. However, our technical assessment team typically produces the assessment report within 40–60 working days after the site survey is conducted.

Yes, it is possible. However, you must first obtain a Certificate of Proper Function (SLF). This requirement is stated in Government Regulation No. 16 of 2021, Article 346 Paragraph 3 which reads: "Buildings that have already been constructed and do not yet have a Building Approval (PBG), must first obtain a Certificate of Proper Function (SLF) in accordance with the provisions of this Government Regulation."

In general, the SKRD (Regional Retribution Assessment Letter) fee varies depending on the policies of each local government.

Our team is committed to assisting with PBG applications throughout the entire territory of the Republic of Indonesia.