Project Name | Integrated Waste Treatment Facility Development Project |
Scope | Construction Work Package Dewatering Work for GWT (Ground Water Tank) Formwork Installation for Structural Works of GWT, Power House, Incinerator, WWTP, and Waste Transfer Station (TPS) Infrastructure Works (Soil Improvement, Box Culvert and U-Ditch Installation) Steel Structure Installation Services for Incinerator, WWTP, and TPS Buildings |
Location | Medan |
Year | 2024 |









This project is part of our portfolio documentation. PT JOGOSAWA PRIMA GROUP.
As a General Contractor, we ensure that every detail of the work is executed properly and in accordance with the highest standards.
We extend our sincere thanks to our client for entrusting us with this project.