What Is SLF?

Sertifikat Laik Fungsi is a certificate issued by SLF the local government to declare that a building is fit for use and occupancy.

The assessment for SLF approval involves both administrative and technical inspections conducted by certified experts in architecture, civil engineering, mechanical-electrical-plumbing (MEP), and environmental fields.

An SLF is valid for 5 years for non-residential buildings and 10 years for residential buildings. Once expired, it must be renewed to and ensure continued compliance and functionality of the building.

konsultan-slf-indonesia

Why is the SLF So Important?

The SLF (Certificate of Feasibility for Functionality) is a mandatory document required for the utilization of any building. According to its legal framework, buildings that do not possess a valid SLF may be subject to administrative sanctions—even demolition.

An SLF serves as legal proof that a building complies with both administrative and technical regulations. It ensures that the structure is safe, functional, and in accordance with existing standards, helping to minimize risks or undesirable incidents during the building's operational use.

Building Feasibility Parameters

There are three fundamental parameters that determine whether a building is considered feasible. In general, feasibility refers to the compliance of a building with applicable rules and regulations.

Administrative Eligibility

Technical Eligibility

Building Reliability

Buildings Required to Have a Sertifikat Laik Fungsi (SLF)

In general, there are two types of buildings that are required to have a

Residential Buildings

Includes private houses, boarding houses (kos), apartments, employee dormitories, and various other residential structures.

Non-Residential Buildings

Includes industrial buildings, factories, hotels, hospitals, clinics, and other commercial or public-use facilities.

Start with a Consultation, Proceed with Confidence

Focus of Activities

Inspecting the feasibility of buildings in accordance with applicable standards and regulations.

Objective

Ensuring that the building’s administrative and technical conditions comply with current regulations.

Function

Declaring the building’s feasibility before it is utilized.

Scope

Utilization and Operationalization of Buildings

Basic Requirements for SLF Application

Fundamentally, there are two essential documents that must be prepared by the building owner. Once the requirements are complete, the application can be submitted directly through the SIMBG ( Sistem Informasi Manajemen Bangunan Gedung) which is managed by the PUPR

Administrative Documents:

  • Application Letter 
  • Company Legal Documents
  • Land Ownership Documents 
  • Building Legal Documents
  • Valid Building Permits (Mandatory) 

Technical Documents:

  • Architectural Technical Drawings 
  • Structural Technical Drawings 
  • Mechanical, Electrical, and Plumbing (MEP) Technical Drawings 
  • Environmental Technical Documents 
  • Technical Data Documentation 

SLF Application Process Flow

alur-pengurusan-slf

Professional & Competent

We execute every project with a high level of professionalism, supported by a team of experts in their respective fields.

Commitment to Quality & Client Satisfaction

Every project is our priority. We are committed to delivering the highest quality—from design to execution—ensuring complete client satisfaction.

Compliant with Applicable Standards

When applying for a Certificate of Feasibility (SLF), the most fundamental aspect is understanding the applicable rules and regulations. Therefore, our team ensures that all standards and regulatory updates are consistently followed and kept up to date.

Why Choose Us?

Contact With Us

Our Client

FAQ

The cost for SLF application can be determined once our technical assessment team has the necessary information, including the location of the building, type of business, total building area, and completeness of the required administrative documents.

In general, the exact timeline for SLF processing cannot be determined precisely, as it depends on the completeness of administrative and technical documents, as well as the scheduling of hearings by the relevant government agency. However, our technical assessment team typically produces the technical review report within 40 to 60 working days after the site survey is conducted.

If recommendations are issued by the experts or technical assessors, the applicant is required to sign a statement of commitment to fulfill the necessary improvements. In some regions, the improvements must be completed before the SLF (Sertifikat Laik Fungsi) can be issued. However, in other regions, the SLF may be issued with a time-limited tolerance, requiring that the improvements be completed within a specified period afterward.

If the missing documents fall within the scope of our agreed services, our team will gladly assist in completing them. However, if the required documents are outside the initial scope of work, we will provide an addendum to formalize the additional services.

We are committed to assisting with SLF applications throughout all regions of the Republic of Indonesia.